The mission
The goal is to contribute to the ecological development of these zones and their companies, while promoting low-carbon solutions and the circular economy.
Our answer
Our facility provides local services through state-of-the-art industrial equipment: high-performance cable recycling, storage, sorting, packaging, and waste massification. With an annual capacity of 35,000 tons of waste, it covers 24,000 m² and aims for an 85% recovery rate.
The investment amounts to €5.7M and will create direct, indirect, and operational jobs. Through this facility, we addresse a major environmental challenge for the Moroccan population.
Additionally, a modern cable processing unit installed on-site will meet the needs of many suppliers in the regional ecosystem. It will grind and separate non-ferrous metals from plastics to access shorter supply chains and implement a true circular economy. This unit will promote local transformation in Morocco and prevent 40% of raw cables from being transported abroad
The results

